Removal and off-site disposal of two existing 1030mm x 740mm arch culverts and open cut installatin of two 1829mm x 914mm pre-cast concrete box replacement culverts located on Maplewood Creek near 2151 Mount Seymour Parkway, North Vancouver.  Included rip rap headwalls and localized channel grading at the culvert inlet and outlets.

All requirements of the Ministry of Forest, Lands and Natural Resource Operations and Department of Fisheries and Oceans.

Maplewood Creek Culvert Replacement/Upgrade